Showing posts with label INTERVIEW. Show all posts
Showing posts with label INTERVIEW. Show all posts

Wednesday, June 23, 2021

Tekla/steel detailing Question paper-10

                       
1).What are the three grade identification colors for ASTM F1554 anchor rods?

F1554-GR.36_BLUE IN COLOUR.
F1554-GR.55_YELLOW IN COLOUR.
F1554-GR.55_RED IN COLOUR.


2).When columns do not have enough local strength, what type of reinforcing
is required to reinforce for web panel-zone shear at a moment connection?

EITHER DOUBLER PLATES OR DIAGONAL STIFFENERS



3.What material type is commonly used for rolled floor plate?

ASTM A786  IS THE MOST COMMONLY USED ROLLED
FLOOR PLATE.



4.Why are fillet welds preferred over groove welds?

Fillet welds generally require less weld metal than groove welds. Additionally, fillet welds do
not generally require beveling and similar base metal preparation. As a result, fillet welds are
generally more economical to make than groove welds. Thus, fillet welds are preferred.



5.Draw Flare Bevel Weld Symbol & Its Condition?

FLARE WELD IS MOST COMMONLY USED TO JOIN  A ROUND OR CURVED PIECE TO
    A FLAT PIECE.


6.Full form of SEOR and GOL?

SEOR_STRUCTURAL ENGINEER OF RECORD.
GOL_GAUGE ON LEG.


7.What is the material grade for twist of type bolts?
 
ASTM F1852 .


8.Please write down the types of beam?

1.sloped beam
2.skwed beam
3.curved beam
4.canted beam
5.hip and valley beam.


9.what is the distance between  hoop to hoop distance in ladder?

4'-0.


10.what is masonry?

The part of building that are made of stone or brick.










Thursday, June 17, 2021

Tekla TEST question paper-9_

1.     High-strength bolts used for the vast majority of field connections are furnished in what two grades?

 A325

A490 

2. The spacing between bolts in standard bolted connections is usually?

3"

3. Currently, the two primary methods of fastening together the major components of a steel-frame structure are BOLTING________and ____WELDING______


4.What angle length is required for a 5-row bolted connection?

1'-3"

5.    Give standard Slot size of 1” dia bolt?

1 1/6"X1"5/16

6.Distance between floor to floor landings is called?

FLIGHT

7    .Maximum column length without splice………. Ft.?

40'-0"

8.What is abbreviation for RFI?

Request for information.

9.  What depth scale is usually used for most steel columns?

12

10.FULL FORM OF BOD,FOW AND JBE?

BOD:BOTTOM OF DECK

FOW:FACE OF WALL

JBE:JOIST BEARING ELEVATION.

1111.When drawing a fillet weld symbol, the size of the fillet weld is always Called out on which side of the symbol?                                                                                                      LEFT SIDE OF THE SYMBOL.

1112 As a detailer what care you need to take if you have SC bolts in a connection?               OVERSIZED HOLES  TO BE PROVIDED                                                                             NO PAINT 3" AROUND HOLES



O







L




4 

Tuesday, June 15, 2021

Tekla interview Question-8

 1.FULL FORM OF ABM ,B.O.BP AND T.O.G?

ABM:ADVANCE BILL OF MATERIALS.

BOBP:BOTTOM OF BASE PLATE.

T.O.G:TOP OF GRATING.

2.WHY  SLOTTED HOLES PROVIDED  IN STEEL MEMBER?

FOR FIELD ADJUSTMENT WE NEED TO PROVIDED SLOTS IN STEEL MEMBER.

ALSO PLEASE NOTE ,LONG SLOTTED HOLES TO BE PROVIDED AT EXISTING CONDITIONS FOR ERECTION FEASABILITY.


3.PLEASE DRAW BEAM RUNNING OVER COLUMN WITH STIFFENERS IN BEAM WEB?


STIFFENERS IS USED TO WITHSTANDS LOADS AND ALSO USED TO TRANSFER LOADS


4.WHAT IS THE TOLERANCES FOR OVERSIZED HOLE AND STANDARD HOLE?

FOR OVERSIZED HOLE-3/16

FOR STANDARD HOLE-1/16

5.WHAT ARE THE MAIN REPORTS NEED TO SEND FOR FABRICATION WHILE SENDING DRAWINGS?

1.DXF

2.NC FILES

3.KISS LIST

4.FABTROL REPORTS

5.BOLT REPORTS

6.DWG FILES

7.TRANSMITTAL.


6.WHAT IS GALVANIZATION AND WHAT IS THE SURFACE PREPARATION FOR GALVANIZED MEMBER?

GALVANIZATION:PROCESS OF ADDING ZINC COATING TO THE METAL TO AVOID CORROSSION.

ASTMA123 IS THE SURFACE PREPARATION FOR GALVANIZED MEMBER


7.WHAT IS THE STOCK LENGTH FOR PLATES ,ANGLES AND BENT PLATES?

ANGLE-20'-0

BENT PLATE-10'-0

PLATE-10'-0.


8.WHAT IS ENCROACHMENT?

THE PERMISSIBLE DISTANCE BEYOND THE WORKABLE GAGE OR THE LIMITED DISTANCE TO ENTER IN TO FILLET OR ROUNDING RADIUS.

GENERALLY TERMED AS "K" VALUE.

?

9.HOW TO FIX WORKPOINTS IN BRACING ?

WORKPOINT PASSES THROUGH THE GAUGE LINE IN CASE OF BOLTING.
WORKPOINT PASSES THROUGH CENTRE OF GRAVITY IN CASE OF WELDING

10.DERVIE E70XX?


E-ELECTRODE

7-TENSILE STRENGTH

X-WELD POSITION

X-ELECTIC CURRENT USED


11.IF HSS COLUMN AND HSS BEAM ARE DIRECTLY WELDING IN FIELD THEN WHAT IS THE MAIN THING REQUIRE FOR FIELD WELDING?

ERECTION AID-(Angle)


12.WHAT IS THE WIDTH OF LADDER AND MAXIMUM LENGTH  OF A LADDER?

WIDTH-1'-6"

LENGTH-20'-0


13.WHEN SEISMIC LOADS WILL FORM?

THE LOADS WHICH ARE FORMED BY SUDDEN VIBRATIONS IS KNOWNS AS SEISMIC LOADS.

GENERALLY SEISMIC LOADS ALSO KNOWN AS EARTHQUAKE LOADS.


14.WHAT IS A POST?

IF WEIGHT IS LESS THAN 300LBS AS PER OSHA THEN WE CALL IT AS POST.

IF WEIGHT IS MORE THAN 300LBS THEN IT WILL BE COLUMN.


15.WHAT ARE THE MAIN FACTORS TO DESIGN A CONNECTION BETWEEN BEAM TO BEAM?

NORMALLY CONNECION DESIGNER WILL DESIGN THE CONNECTION BASED ON LOADS(KIPS)

BASED ON STRUCTURAL ENGINEER REQUIREMENTS.





Wednesday, June 9, 2021

TEKLA & STEEL DETAILING QUESTIONS INTERVIEW-7

 1.FULL FORM OF NISD AND HVAC?

NISD:NATIONAL INSITITUTE OF STEEL DETAILING.

HVAC:HEAT VENTILATION AND AIR CONDITIONING


2.WHAT IS THE SHORTCUT  TO OPEN DRAWING LIST IN TEKLA?

MODELER EDITOR:CTRL+L

DRAWING EDITOR: CTRL+O


3.MENTION SOME CONDITIONS WHERE ALL AROUND FILET WELD APPLICABLEDE?

1.BASE PLATE & COLUMN

2. BEAM &END PLATE 

3. CAP PLATE & COLUMN


4.IF DESIGN DRAWING DOES NOT FURNISH WELD SIZE THEN  HOW TO DETERMINE WELD SIZE BETWEEN TWO MEMBERS ?

WELD SIZE  TO BE CONSIDER BASED ON  THE LOWEST THICKNESS BETWEEN TWO MEMBERS 


5.DERIVE BU4-GF?

B-BUTT WELD

U-UNLIMITED BASE METAL THICKNESS

4-SINGLE BEVEL

GF-WELDING PROCESS


6.HOW TO FIX RUNGS IN LADDER ?

FIRST WE NEED TO FIX TOP OF RUNG EQUAL TO  TOP OF FINISIED LEVEL OR TOP OF GRATING  THEN WE NEED TO SPACE THE RUNGS.

GENERALLY RUNG TO RUNG SPACING SHOULD BE 1-0


7.WHAT IS THE OVERHEAD CLEARENCE BETWEEN STAIR AND FLOOR AS PER OSHA?

6'-8" TO BE MAINTAINED


8.WHAT IS THE RULE BETWEEN STRINGER WIDTH AND LANDING CLEARENCE ?

LANDING  CLEARENCE SHOULD BE MORE THAN THE STRINGER WIDTH.THIS A GENERAL PRACTICE TO DETAIL STAIR LANDING


9.WHAT IS THE MAX TREAD AND RISER DIMENSION  IN  STAIR?

RISER SHOULD BE  MAX 7"
TREAD SHOULD BE  MAX 11"

10.WHAT IS THE MAXIMUM SPACING TO BE MAINTAINED  BETWEEN POST TO POST AND PICKET TO PICKET?

POST TO POST-4'-0
PICKET TO PICKET-4"

11.HANDRAIL HEIGHT TO BE FIXED FROM?

NOSING LINE OR TOP OF FINISHED FLOOR.


12.DEFINE NOSING LINE?

THE LINE WHICH TOUCHES ALL NOSING POINTS IS KNOWN AS NOSING LINE

NOSING POINT: INTERSECTION OF PAN TREAD AND RISER 


13.HOW TO CONNECT WALL RAIL TO WALL?

CONNECTION BETWEEN WALL AND WALL RAIL  BY USING WALL BRACKET .

GENERALLY WALL BRACKET IS A BOUGHT ITEM.


14.WHAT IS THE ANGLE  TO DETAIL STAIR AS PER OSHA?

STAIR ANGLE SHOULD BE  30 DEGREE TO 50 DEGREE TO DETAIL STAIR.











Monday, May 24, 2021

TEKLA INTERVIEW QUESTION PAPER-6

1.WHAT IS THE FULL FORM OF AWS AND LRFD?

AWS:AMERICAN WELDING SOCIETY.

LRFD: LOAD RESISTANCE FACTORY DESIGN.

2.WHAT ARE THE INPUT DRAWINGS OF STEEL DETAILING?

1.STRUCTURAL DRAWING

2.ARCHITECTURAL DRAWING

3.CIVIL DRAWINGS.

4.DECK DRAWINGS

5.JOIST DRAWINGS

6.ELEVATOR DRAWINGS

3.WHAT IS THE FLANGE GAGE FOR W8X31 COLUMN OR BEAM?

4"

4.DEFINE BACK CHARGE?

COSTS DIRECTED TO A FABRICTOR OR STEEL DETAILER FOR ERRORS IN FABRICATION OR DETAILNG.

5.WHAT IS MEANT BY SQ2E , SQ1E AND BEV?

SQ2E:SQUARE CUT BOTH ENDS

SQ1E:SQUARE CUT ONE END

BEV:BEVEL

THIS TERMS USUALLY WILL MENTION IN DRAWING BOM

6.WHAT ARE THE TYPES OF DECK?

1.COMPOSITE FLOOR DECK

2.ROOF DECK.

3.CELLULAR DECK.

4.FORM DECK.

7.WHAT IS THE USE TOE PLATE AND RUNGS?

TOE PLATE:

IS A SAFETY FEATURE IN HANDRAILS TO AVOID THE ACCIDENTS DUE TO SLIPPING OF FOOT.

RUNG:

RUNGS ARE STEPS IN LADDER TO ACCESS THE PLATFORM OR FLOOR


8.WHAT IS GRADE FOR REBAR ?

NORMAL GRADE IS ASTM A706 GRADE-60

IF IT IS WELDED THEN ASTM A615


9.IN W16X40 WHAT IS 16 AND WHAT IS 40?

16-IS NOMINAL DEPTH

40 IS LBS/FEET

10.WHAT IS THE CLEARENCE BETWEEN WALL TO HANDRAIL OR WALL RAIL?

CLEARENCE IS 1 1/2"


11.WHAT IS THE USE OF BACK UP BAR?

IN ORDER TO AVOID THE OVERFLOW OF WELD.


12.WHAT ARE THE TEMPORARY BOLTS AND WHAT ARE THE HIGH STRENGTH BOLTS?

A307 BOLTS ARE TEMPORARY  WHEREAS A325 AND A490 ARE HIGH STRENGTH BOLTS.


13.IF ONE BEAM IS STRAIGHT AND OTHER BEAM IS SKEWED THEN WHAT KIND OF 

CONNECTION WE NEED TO PROVIDE?

BENT PLATE CONNECTION WE NEED TO USE


14.WHAT IS ASTMA325T BOLT?

BOLT IS FULLY THREADED UP TO FULL LENGTH OF SHANK.


15.WHAT IS THE MAXIMUM AVAILABLITY LENGTH FOR A BOLT?

 MAXIMUM LENGTH AVAILABLITY FOR A BOLT IS 8" ,IF IT IS MORE THAN 8" THEN

WE NEED USE ROD.

Wednesday, May 12, 2021

TEKLA & STEEL DETAILING INTERVIEW SIX QUESTIONS

 1.WHICH TYPE OF CONNECTION TO BE PREFERABLE IN FIELD TO REDUCE COST?

   BOLTED CONNECTION IS PREFERABLE WHEN COMPARED TO FIELD WELDING.

*.FIELD WELD IS SO COSTLY THAN FIELD BOLTING.


2.PLEASE DRAW COLUMN WITH BASE PLATE CONNECTION?

JUST FOR REFERENCE

COLUMN WITH BASE PLATE

1.       Bottom of base plate elevation.

2.       Orientation mark of the column.

3.       Column to base plate weld.

4.       Locations of the holes in base plate with respect to the column center line.

5.       Hole diameter and number of holes in base plate.

6.       Base plate thickness.


3.WHAT IS THE HOLE SIZE IN BASEPLATE FOR 3/4 DIA TO 2 1/2 DIA ANCHOR RODS?

 

Size of Anchor – Rod Holes In Base Plates

 

Anchor Rod Dia

 

Max. Hole Dia

 As per LRFD

Hole Dia

 As per ASD

 

 3/4

1 5/16

1  1/16

 7/8

1 9/16

1  3/16

1   

1 13/16

1  1/2

1 1/4

2 1/16   

1 3/4

1 1/2

2  5/16

2

1 3/4

2 3/4

2 1/4

2   

3 1/4

3

2 1/2

3 3/4

3 1/2

Larger holes are permitted if Plate Washers Used.


4.WHAT IS THE USE OF LEVELLING PLATE?

Normally thickness of leveling plate will be ¼ -in. The  leveling plate may be larger than the base plate to accommodate tolerance of Anchor Rod placement.

5.WHAT IS THE USE OF PLATE WASHER?

 The oversize holes should be covered with a heavy plate washer. The minimum thickness should  be one-third the diameter of the anchor rod

  6.WHAT IS THE GRABRAIL EXTENSION FROM LAST TREAD ?

1'-0

 

 

Sunday, May 9, 2021

TEKLA & STEEL DETAILING INTERVIEW QUESTION PAPER-5 .

 1.WHAT IS THE GRADE FOR WASHER ,NUT ,STUD AND DTI WASHER?

WASHER-F436

NUT-A563

DTI WASHER-F959

STUD-A108

2.WHEN TAPPERED WASHERS WIIL USE?

TAPPERED WASHERS ARE USED WHEN THE SURFACE BEING BOLTED H AS A

SLOPED SURFACE,SUCH AS FLANGE OF C SHAPE AND S-SHAPE.



3.DEFINE BOLT LENGTH?

BOLT LENGTH IS THE DISTANCE FROM BEHIND THE BOLT HEAD TO END OF THE BOLT.



4.WHAT IS A SNUG TIGHT INSTALLATION?

SNUG TIGHT IS THE BOLT TIGHTENING PROCESS AND TIGHTNESS IS ATTAINED WITH FEW HITS OF IMPACT WRENCH OR FULL EFFORT OF AN IRON WORKER BY USING ORDINARY SPUD WRENCH  TO BRING THE CONNECTED STEEL IN TO FIRM CONTACT.


5.WHAT IS THE LONG SLOTTED HOLE FOR 1" BOLT?

1 1/16" X2  1/2"

6.WHAT ARE THE MAIN POINTS TO BE CONSIDERED WHILE CHECKING DRAWINGS?

100% DIMENSIONS ACCURACY.

CUSTOMER SPECIFIC STANDARDS.

DESIGN DRAWING POINTS.

FABRICABILITY

ERECTABILITY


7.WHO IS FABRICATOR AND ERECTOR?

FABRICATOR:IS RESPONSIBLE FOR FABRICATING THE STRUCTURES IN THE SHOPS BASED ON DETAILS GIVEN BY THE DETAILER.

ERECTOR: IS RESPONSIBLE FOR ERECTING THE STRUCTURE IN FIELD BASED ON THE DETAILS GIVEN BY DETAILER.


8.INCH TO MM CONVERSIONS?

1 INCH = 25.4MM = 0.0254M

1 M = 40 INCHS

1 FOOT = 300 MM = 12 INCHS

1KIP = 454 KILOGRAMS

1000 POUNDS = 1 KIP

1 POUND =  0.454 KILOGRAM


9.WHAT IS STICH WELD?

A SERIES OF WELDS OF A SPECIFIED LENGTH THAT ARE SPACED A SPECIFIED DISTANCE FROM EACH OTHER



10.WHAT IS A CLEAR SPAN?

LENGTH OF SPAN FROM FACE TO FACE OF SUPPORTS IS KNOWN AS CLEAR SPAN.



11.WHAT IS THE LIFTING HOLE DIA FOR COLUMN OR ANY STEEL?

2"Ø MIN





Friday, April 23, 2021

TEKLA INTERVIEW / STEEL DETAILNG QUESTIONS PAPER-4

 1.WHAT ARE THE WELDING POSITIONS?

1.FLAT.

2.HORIZONTAL.

3.VERTICAL.

4.OVERHEAD.


2.WHAT IS A TACK WELD?

A TEMPORARY WELD USED TO HOLD PARTS IN PLACE WHILE MORE EXTENSIVE, FINALWELDS ARE MADE.


3.WHAT ARE THE JOINTS OF WELD?

1.BUTT

2.LAP

3.CORNER

4.EDGE

5.T-JOINT

4.WHAT IS SURFACE PREPARATION AND SSPC?

SSPC-STRUCTURAL STEEL PAINTING COUNCIL.

SP1  - SOLVENT  CLEANING.

SP2  - HAND TOOL CLEANING

SP3  - POWER TOOL CLEANING.

SP5-  WHITE METAL BLAST 

SP6  - COMMERICAL BLAST 

SP7-  BRUSH OFF BLAST.

SP10- NEAR WHITE BLAST

SP12- HIGH AND ULTRA HIGH PRESSURE WATER JETTING.


5.Which are characteristics of Special Moment Frames?

a. the expectation of withstanding significant inelastic deformations under the

design earthquake

b. frames where the beam-to-column connections must be capable of sustaining

an inter-story drift angle of at least 0.04 radians

c. frames where qualification testing or pre qualification of beam to-column

connections is required


6.Paint thickness is commonly measured in which units?

MILS.


7.What is the purpose of a weld access hole is to?

a) allow the welder access to start and stop the beyond the plane of the beam

web.

b) minimize restraint to allow for shrinkage in the welded joint.

c) eliminate intersection of welds in orthogonal directions.


8.What is the difference between shop fabrication drawings and erection drawings?

Shop drawings are detail drawings of columns, beams and etc. Where as erection drawings are which shows all the locations of all structural steel framing members.    


9.If joist length more than 40 feet what type connection we have to use.?

 IF JOIST IS MORE THAN 40'-0 WE NEED TO FOLLOW BOLTED CONNECTION.

IF JOIST IS LESS THAN 40'-0 WE NEED TO FOLLOW WELDED CONNECTION.


10.How do view the beams in erection plan in case of beam detailing?

from left to right  and bottom to top.


11. What will be provided to strengthen the beam when the beam frames over the column?

we need to provide stiffeners in beam for load transfer.


12.what is the Formula for cut length?

C/C distance– set back dimensions – ½ on either side.


13. if Knife edge connection being provided by welding the 2 clips to the column and I am not able to erect from the sides. what we need to do?

 cut the bottom flange and insert the beam from top.


14.what are the anchor rod hole dia for 3/4Ø,1"Ø,7/8Ø?

3/4Ø-1"1/16Ø

7/8Ø-1"3/16Ø

1"Ø-1"1/2Ø

15.IF WE HAVE LONG SLOTS IN BEAM OR  ANY STEEL MEMBERS?WHAT WE NEED TO

 TO COVER SLOTS?

WE NEED TO PROVIDE PLATE WASHERS TO COVER THE LONG SLOTS.


16.WHAT IS A BUILT UP MEMBER?

A MEMBER MADE UP OF STRUCTURAL STEEL ELEMENTS THAT ARE WELDED OR BOLTED TOGETHER IS KNOWN BUILT UP MEMBER.

*BY USING PLATES WE CAN MADE A W MEMBER THAT IS KNOWN AS BUILT UP MEMBER.


17.WHAT IS A EDGE DISTANCE?

THE PERPENDICULAR DISTANCE FROM CENTRE OF HOLE TO EDGE OF THE MEMBER

IS KNOWN AS EDGE DISTANCE.


18.WHAT ARE THE OSHA REQUIREMENTS FOR BRACING?

1.ERECTION BOLTS ARE REQUIRED AT VERTICAL TUBE OR ANGLE BRACINGS.

2.OVERSIZED HOLES IN GUSSET PLATE FOR ERECTION FEASBILTY ,WE NEED TO

TAKE CONFIRMATION FROM CLIENT.


19.WHAT IS THE MAXIMUM ROW OF BOLTS FOR W6 TO  W36?

W6-1,

W8,10-2

W12,W14-3

W16-4

W18-5

W21-6

W24-7

W27-8

W30-9

W33,36-10

20.WHAT IS THE FIRST HOLE DISTANCE FOR W8 AND W27?

W8-2  1/2"

W27-3  1/2"

21.WHAT IS THE GAGE FOR L2 AND L4?

L2-1  1/8"

L4-2 1/2"


BELOW CONVERSIONS ARE IMP.


1/16-0.0625                5/16-0.3125

1/8-0.125                    3/8-0.375

3/16-0.1875                7/16-0.4375

1/4-0.25                       1/2-0.5


9/16-0.5625              13/16-0.8125

10/16- 0.625              14/16-0.875

11/16-0.6875             15/16-0.937

3/4- 0.75                     16/16-1


THANKS AND PLEASE FOLLOW ME
URS
DETAILER.




Friday, March 26, 2021

TEKLA CHECKER INTERVIEW QUESTIONS-3

1In addition to the standard K-series open-web steel joists, steel joists are also available in the LH-series and DLH-series. What to the letters LH and DLH signify?      

LH- Long Span

DLH-Deep Long Span

2.what is the seating depth for K,LH  and joist girder?

K-2  1/2" 

LH-5"

JOIST GIRDER-7  1/2"

3.What is the grade for erection bolts?

A307-MACHINE BOLTS.

4.What is a lintel?

 Lintel is a primary structural number placed above doors, windows or other openings to support masonry above.

Generally we will maintain 8" bearing.


5.What is a sag rod?

A tension member used to limit the movement of a girt or purling in the direction of week axis before

installation of sheeting or roofing.

sag rods is generally known as thru rods.



6.What is a sill, jamb ,header?

SILL: The bottom horizontal member of a door or window openings.

JAMB: Vertical side of a  wall opening.

HEADER: Horizontal  member at the top of wall opening.

7.what are the types of weld joints?


8.What are the types of bolting joints?

1.Bearing joint:

In the bearing joint  load will transfer through bolt.

2.slip critical joint.

In slip critical condition ,load will transfer through friction.


9.What are the short slotted hole size for 3/4"Ø and 7/8"Ø bolt?

1.For 3/4"Ø_13x16"X 1".

2.For 7/8"Ø_15/16"X 1 1/8"


10.What are the OSHA requirements for column?

1.Minimum 4 anchor rods required for column base plate.

2.If column length is above 40'-0 then we need to provide splice connection.

   splice connection application should be 4'-0 from finished floor.

3.Safety cable holes to be provided in perimeter columns for safety purpose.

   generally safety cables are 1'-9" from finished floor.


11.What is a galvanization?

The process of adding zinc coating to steel members to avoid corrosion is known as galvanization.


12.Where we need to follow "NO PAINT" condition?

1.At fireproofing
2.field weld areas.
3.slip critical condition (3"no paint around holes")
4.At shear connectors(NO PAINT ON TOP OF TOP FLANGE).
5.Embeded steel.

13.Why gages are standardized?

1.To maintain proper edge distance.
2.To avoid fasteners enter in to k value(ENCHROCHMENT).

14.What is the grade for shear stud connectors?
A108

15.What is a embed plate?

A steel plate cast into concrete structure which is used to transfer loads from girder joists or beam to
concrete beams.

16.What is the height of guard rail and  hand rail from finish floor?

For guard rail:3'-6" from finish floor.
For  hand rail : 2'-10" from finish floor.

17.when cage is to provided or required in ladder?

If the ladder is above 20'-0"height, We need to provide cage in ladder for safety purpose.

Cage will be start from 7'-0  height.



















Friday, March 19, 2021

TEKLA INTERVIEW questions test paper-2

 1.What is the difference between steel bar and steel plate

The difference between plate and bar is based upon size and production procedure. Flat stock has

historically been classified as a bar if it is less than or equal to 8 in. wide, and as a plate if it is

greater than 8 in. wide. See the AISC LRFD Manual of Steel Construction, third ed., page 1-9 for

discussion


2.Is it acceptable to galvanize ASTM F1554 anchor rod?

Yes. ASTM F 1554 anchor rods can be galvanized and the requirements for the protective

coating are stated in that ASTM F1554 Standard


3.Explain About DTI Washer?

DTI means “direct tension indicator,”a deformation-calibrated washer used for the installation

of high-strength bolts.


4.Explain About Beveled Washer & It’s condition ?

Beveled washers are used to compensate for a lack of parallelism between the outer faces of a

bolted joint as is found in such cases as a joint involving the flange of an American standard beam

(S-shape). To do so, the beveled washer must be properly oriented in the assembled joint. The

square or rectangular shape simplifies proper orientation during installation.


5.Name three methods for setting a column base to proper elevation

The use of a leveling plate, leveling nuts, and shim stacks are three alternatives. These and other

methods are discussed in greater detail in the AISC LRFD Manual of Steel Construction, beginning

on page 11-54


6.What is the definition of “backgouging”?

According to AWS D1.1.-2000, backgouging is “the removal of weld metal and base metal from

the weld root side of a welded joint to facilitate complete fusion and complete joint penetration

upon subsequent welding from that side


7.What is a “batten plate”?

A batten plate is a plate element used to rigidly join two parallel components of a built-up

column, girder, etc. designed to transfer shear between each component.


8.Explain about purlin?

A horizontal longitudinal member that rests on the top chords of a roof truss or girder to support

the roof..


9.Explain about girt?

A horizontal member in the side or end of a building used to support side covering.


10.Explain about sweep & Camber with sketches?

Camber: A comparatively flat vertical curve placed in a truss,beam or girder to counter act a part

of deflection.

Sweep: A comparatively flat vertical curve placed in a truss,beam or girder induced through
cold bending or by the application of heat.


11.Explain about E-Plans?

A drawing consisting of line diagrams representing framing in plan,elevation,section etc to

which are added principal dimensions,erection marks,notes and, when required,enlarged details,thus

providing the erector with sufficient information to place the members in the structure.These

drawings donot normally show the erection scheme,schedule,rigging devices,temporary

supports,safety devices etc.


12.When Grout Holes Are Required in Base Plate?

Grout holes are used when the base plate is 2'-0".


13.Caliculate the length of anchor bolt ?

Dia of rod ¾,Grout thk2”,Base plate thk 1”3/4

length of anchor rod = embed+projection

= (12d)+(Gt+BPt+2d+1/2)

= 12(3/4) + 2 + 1 ¾ + 2(3/4) + ½

= 4'-2"3/4.


14. What diameter hole is currently recommended in a base plate for a 1” diameter anchor

rod?

113/16 inch diameter. The current recommendations for anchor rod holes in base plates are

listed in Table 14-2 of the 3rd edition LRFD Manual. These hole sizes have been increased from the

earlier ASD editions to provide for better harmonization with actual performance of other trades in

setting anchor rods.


15.What does the acronym FCAW-S stand for?

Flux-cored arc welding—selfshielded.From Annex B of AWS D1.1-2000: a flux cored arc

welding process


16.What are two basic types of camber?

Two basic types of camber are natural mill camber and induced camber


17. What is a faying surface?

According to the glossary of the 2004 RCSC Bolt Specification (a free download from

www.boltcouncil.org),“faying surface” is defined as the plane of contact between two plies of a

joint.


18.What material type is commonly specified for floor plate?

ASTM A786 is the standard specification for rolled steel floor plates


19).Which is the proper specification of the material: “ASTM A992 grade 50” or

“ASTM A992”?

Because ASTM A992 is a 50 ksi material only, it is properly specified as “ASTM

A992”.


20.Which type of brace is commonly referred to as a “Chevron” brace?

inverted V-brace


21.What is AESS?

AESS stands for Architecturally Exposed Structural Steel. AISC Code of Standard

Practice Section 10 covers fit, finish, and other related requirements for

steel that is designated in the contract documents as AESS. Structural steel can

be designated as AESS when the desired architectural effect or appearance of

exposed structural steel is such that the additional cost of more stringent

tolerances and preparation is justified.


22.What is a snug-tight bolted joint?

According to the glossary of the bolt spec, a snug-tight joint is one in which the

bolts have been installed in accordance with Section 8.1. The snug-tightened

condition is the tightness that is attained with a few impacts of an impact wrench

or the full effort of an ironworker using an ordinary spud wrench to bring the plies

into firm contact.


23.What is a W530x66?

W530x66 is the metric designation for a W21x44. The nominal depth of a

W21x44 is 530 mm, and its weight is 66 kg/m. The metric equivalents

of all U.S. Structural steel shapes,


24.What is first bolt distance for W8 beam connection?

2 1/2" inch


25.Commonly used Shear tab thickness ?


3/8" thk

Featured Post

WHAT IS TEKLA & STEEL DETAILING?

TEKLA means building inormation modelling software used in building and construction industries for steel,concrete and precast detailng . Ty...